Installation

Installation: what to expect.

The Power Cube is a solid-state cabinet that lives indoors and connects to your circuits like any indoor generator — but without fuel, exhaust path or noise to plan around. Here is what a typical installation involves.

The Neutrino Power Cube from a 3/4 angle, showing the side panel with output ports

Typical setup, step by step

01

Site check

A short walk-through confirms a suitable indoor location (basement, utility room, container, technical room). A footprint of roughly 0.8 × 0.4 m and ≈ 50 kg load capacity is all the space needs to provide.

02

Delivery & placement

The cabinet is delivered as a single unit. Two people can move and position it. No fuel storage, exhaust route or special ventilation has to be planned.

03

Electrical connection

A qualified electrician connects the AC outputs (380 V three-phase and 220 V single-phase) and any DC rails needed (24 V · 12 V · 5 V / USB) to the building’s distribution panel, following the official installation guidance.

04

Commissioning & test

The system is brought online and tested under load. The Power Cube starts producing immediately — there is no warm-up cycle.

05

Ongoing operation

Continuous, near-silent, indoor operation. No fuel logistics, no exhaust, no regular service windows like a diesel — solid-state means minimal maintenance.

What you will need

An indoor location

Roughly 0.8 × 0.4 × 0.6 m of floor space plus access for an electrician. A basement, utility room, technical room or container all work.

Access to the distribution panel

The cabinet is wired into the building’s electrical panel, exactly as a normal indoor generator would be.

A qualified electrician

Installation should be carried out by a qualified electrician following the official installation guidance for the Power Cube.

No fuel store, no exhaust path

Because there is no combustion, no fuel tank, fuel line, exhaust pipe or emission permit has to be planned.

Safety in one paragraph

The Power Cube is a solid-state generator — no combustion, no fuel, no high-pressure storage, no exhaust gases. That removes the safety considerations of diesel, gas and hydrogen at the installation site. The remaining requirements are the standard electrical ones for any indoor power source: proper wiring, breakers, earthing and panel layout — handled by a qualified electrician following the official installation guidance.

Ready to plan an installation?

Get in touch about a Power Cube installation for your site.

Contact

Frequently asked questions about installation

How long does a typical installation take?
Most retrofits take 1–2 working days: site check, placement, electrical connection by a qualified electrician, commissioning under load. A new build can plan the wiring from day one and adds no real overhead.
Can I install a Power Cube myself?
Placement of the cabinet is straightforward for two people. The electrical connection to the distribution panel must be carried out by a qualified electrician, as with any indoor generator.
What if I have an existing solar / battery system?
The Power Cube ties into the existing distribution panel via a hybrid inverter or a tie-in switch. It complements solar (continuous baseload) and reduces the size of the battery you need.
Does it work during a grid outage?
Yes — with an appropriate transfer switch the Cube continues to feed the building's essential circuits when the grid drops. No fuel logistics, no monthly diesel test cycle.
What ongoing maintenance is required?
Solid-state operation means no fuel filters, no oil changes, no exhaust cleaning. A periodic electrical inspection follows the same schedule as any indoor installation.